SKU: 78118
Halstead Detection Electrode Long Lead 500566
BRAND: Halstead Spares
CATEGORY: Halstead
Halstead Detection Electrode Long Lead 500566
£11.88 EX. VAT
£14.26 INC. VAT
Halstead Detection Electrode Long Lead 500566
DESCRIPTION
Halstead Detection Electrode Long Lead 500566PRODUCT SPECIFICATION

- • SKU: 78118
- • Manufacturer: Halstead Spares